Yılmaz’ means ‘dauntless’. ‘Argüden’ means ‘honorable’, ‘guide for integrity’ and is pronounced as ‘argue then’, as in the phrase “if you don’t agree, argue then.”
  • Beni Takip Edin
  • Follow Me
Stratejist, Yönetim Kurullarının Doktoru Strategist, Governance GuruThought is the foundation of action

RAND Corporation

RAND Corporation is a leading think-tank that helps improve public policy and decision making through research and analyses. At the RAND Corporation, Yılmaz Argüden worked on research projects including improving the effectiveness of energy policies and tax policies, developing human resources systems, and management of mega projects. Many policies were influenced and updated based on these research findings and recommendations, and these studies have been widely cited.

1980’s

Michael Rich, RAND CEO

With Board Members

Mike Mullen, Jim Thomson, Robert Valdez

Two Key Projects During His Thesis

Personnel Management in the Military:
Effects of Retirement Policies on the Retention of Personnel

Document No: R-3342-AF
Year: 1986
Pages: xxi, 203
ISBN: 0833006959

Author: R. Yılmaz Argüden

Keywords: Armed Forces–Recruiting, enlistment, etc.–Mathematical models; Armed Forces–Appointments and retirements–Mathematical models; Armed Forces–Personnel management–Mathematical models

Abstract: Many studies of the military retirement system are based on models whose structures are likely to be changed by the policy interventions that they analyze. Such models could lead to seriously biased predictions of the retention effects of alternative retirement systems. This report examines the adequacy of the existing retention models for retirement policy analysis, quantifies their limitations, suggests improvements, and develops a simulation methodology to test the suggested and future improvements. It also examines the importance of paying analytical attention to the inputs of the retention models.

Understanding the Outcomes of Mega-Projects:
A Quantitative Analysis of Very Large Civilian Projects

Document No: R-3560-PSSP
Year: 1988
Pages: xiv, 87
ISBN: 0833008439

Authors: Edward W. Merrow, Lorraine McDonnell, R. Yılmaz Argüden

Keywords: Economic development projects–Cost control

Abstract: This report analyzes the costs, problems, and operations of megaprojects (projects requiring huge physical and financial resources) by examining 52 civilian projects ranging in cost from $500 million to over $10 billion (in 1984 dollars). The authors consider whether megaprojects meet their cost, schedule, and performance goals; whether they typically display poorer outcomes than smaller projects; what factors contribute to good and bad outcomes; and what steps can be taken to minimize the cost, schedule, and performance risks associated with megaprojects. The authors recommend that the sponsors of megaprojects (1) broaden the scope of the project definition phase to rigorously and systematically include cultural, linguistic, legal, and especially political factors; (2) train project managers to be as aware of the project’s institutional environment as of the internal project organization; and (3) question whether new technology, construction techniques, or design approaches are essential to the mission of the project.

Other Books Published by RAND

Ultimate origin of all phenomena is changeFou-Hi